| Minimize Boiler Shot Cycling Losses |
|
|
|
| Written by USDOE Office of Industrial Technologies |
| Thursday, 01 July 2010 09:22 |
Minimize Boiler Short Cycling LossesBoiler “short cycling” occurs when an oversized boiler quickly satisfies process or space heating demands, and then shuts down until heat is again required. Process heating demands can change over time. Boilers may have been oversized for additions or expansions that never occurred. Installing energy conservation or heat recovery measures may also reduce the heat demand. As a result, a facility may have multiple boilers, each rated at several times the maximum expected load. Boilers used for space heating loads are often oversized, with their capacity chosen to meet total building heat losses plus heating of ventilation and infiltration air under extreme or design-basis temperature conditions. No credit is taken for thermal contributions from lights, equipment, or people. Excess capacity is also added to bring a facility to required settings quickly after a night setback. Cycling Losses This decrease in efficiency occurs, in part, because fixed losses are magnified under lightly loaded conditions. For example, if the radiation loss from the boiler enclosure is 1% of the total heat input at full-load, at half-load the losses increase to 2%, while at one-quarter load the loss is 4%. In addition to radiation losses, pre- and post- purge losses occur. In the pre-purge, the fan operates to force air through the boiler to flush out any combustible gas mixture that may have accumulated. The post- purge performs a similar function. During purging, heat is removed from the boiler as the purged air is heated. Example Fractional Fuel Savings = (1 – E1 /E2 ) 12
= (1 – 72.7/78.8) x 100
= 7.7%
If the original boiler used 200,000 MMBtu of fuel annually, the savings from switching to the smaller boiler (given a fuel cost of $8.00/MMBtu) are: Annual Savings = 200,000 MMBtu x 0.077 x $8.00/MMBtu
= $123,200
Multiple Boiler Operations Use automatic controllers that determine the incremental costs (change in steam cost/change in load) for each boiler in the facility, and then shift loads accordingly. This maximizes efficiency and reduces energy costs. If possible, schedule loads to help optimize boiler system performance. Powerhouses containing multiple boilers that are simultaneously operated at low-fire conditions offer energy-saving opportunities for using proper boiler allocation strategies. Boiler Downsizing FOR ADDITIONAL INFORMATION, PLEASE CONTACT:
EERE Information Center 1-877-EERE-INF (1-877-337-3463)
Industrial Technologies Program Energy Efficiency and Renewable Energy
U.S. Department of Energy
Washington, DC 20585-0121
|



| Building a Best Practices Foundation: Corporate Energy Management at Shaw Industries 30/06/2010 | Alliance to Save Energy Building a Best Practices Foundation: |
Compressed Air Case Studies 09/06/2010 | Irish Energy Centre Compressed Air Case Studies Compressed air is widely used in all aspects of industry. It is non- hazardous, readily available, can be stored easily and is a convenient source of power for a range of [ ... ] | Other Articles | ||
Latest Discussions
Re: Equipment for new plant
marketing1 1.4.2011 11:40
Equipment for new plant
pberko 31.3.2011 18:45
Re: The Catalyst - Archived Issues?
admin 28.6.2010 19:10